Tunga Lyft tilts down machines to Spain and India
Monday, 21 January 2019
by ln
Another job done by our new 122 ton hydraulic block. The weight of the presses is 42 tons each. Tunga Lyft took on the assignment for the end customer. MORE INFORMATION? Do you have questions about how we can help you? Contact Håkan Wass. Tel: +46 (0)73 310 51 25 E-mail: hakan@tungservice.se
Relocation of stock of about 15,000 items for DHL
Monday, 21 January 2019
by Axel Brinnen
Tunga Lyft was asked if they could move a warehouse of about 15,000 items for DHL, which has warehouses for their customers. The move would take place during a production stop of only 2 days. We made a prototype of lifting the customer’s shelving system and rolling it out on a truck for transportation to
Tunga Lyft lifts soda can for Metso Power in Arauca, Chile
Monday, 21 January 2019
by Axel Brinnen
During the strong earthquake earlier in the spring of 2010, the 60-meter-high, 1,000-ton soda boiler had sunk about half a meter due to severe bending of the three-meter-high overhead beams and damage to some of the peripheral equipment. Fortunately, it turned out that the boiler itself survived without serious damage. A tender was issued and
NCC builds at Lindholmspiren in Gothenburg
Monday, 21 January 2019
by Axel Brinnen
NCC is building a new property at Lindholmspiren in Gothenburg. The building will have four triangular bay windows suspended in the air towards the quayside. Our job is to pile up from underneath with the help of roof lifting/ triangular masts so that NCC can then finish building the entire cage beam right up to